Complete Construction Contract

What Our Full Contract Covers

Plan & Approvals

We provide complete Vaastu-compliant architectural plans and assist with necessary municipal or gram panchayat permissions.

Structural Construction

Strong foundation, RCC columns, beams, and slab execution using premium cement (53 Grade) and TMT steel.

Brickwork & Plastering

Quality red brick masonry followed by double-coat sponge finish plastering for smooth and crack-free walls.

Electrical & Plumbing

Concealed wiring using branded cables (Finolex/Polycab) and premium sanitary piping.

Flooring & Painting

Premium Granite or Vitrified tiles flooring and 2 coats of wall putty with Asian Paints emulsion for a royal look.

Doors & Key Handover

Main door with best Teak Wood, internal flush doors, windows fitting, final cleaning, and key handover.

Choose Your Construction Package

Economy Class

  • Cement: Standard PPC Cement (Top Brands).
  • Steel: Fe 500 Grade TMT Bars.
  • Sand: Good Quality River Sand.
  • Flooring: Vitrified Tiles (2x2 ft).
  • Doors: Main Door Teak Wood, Others Flush Doors.
  • Paint: Asian Paints Tractor Emulsion.

Premium Class

  • Cement: 53 Grade (Ultratech/Maha/Birla).
  • Steel: Fe 550 Grade (Tata/Vizag/JSW).
  • Sand: Double Washed River Sand.
  • Flooring: Granite or Premium Vitrified Tiles.
  • Doors: All Teak Wood Frames & Shutters.
  • Paint: Asian Paints Royale / Premium Emulsion.

Luxury Class

  • Structure: Strongest RCC Design Standards.
  • Flooring: Italian Marble / High-end Granite.
  • Interiors: False Ceiling + Cupboards Included.
  • Bathroom: Jaguar/Kohler Fittings.
  • Electrical: Automation & High-end Lighting.
  • Elevation: 3D Premium Front Elevation Design.

Why Trust Us With Your Dream Home?

Legal Agreement

We provide a clear, legally binding agreement on bond paper detailing every specification and material brand.

No Hidden Charges

The price we quote is final. We do not ask for a single rupee extra during construction unless you change the plan.

On-Time Delivery

We value your time. If we delay the project handover beyond the agreed date, we pay a penalty to you.